Friday, 16 September 2011

Shooting Schedule

This schedule has been devised by me and Rosie to suit us both, it will allow us to know exactly what to do on days of filming.We decided to film some in the week so we can use school area to shoot in and also at the weekend for the locations that are not in school.

Monday 19th September- on this filming session we want to shoot all of the music studio shots as we will be filming after school. We will need full access to the music studio. Me and Rosie will set up the studio before St Raymond arrive which will make filming easier as we can start straight away. If we complete all the required shots we want for this we will move to the outside locations such as the walls and the fields and shoot those shots.

Sunday 25th September- on this filming session we will complete any shots we weren’t able to get around the outdoor locations in college. We will also walk down into Stapleford and get the required shots outside the factories. For this day we will have to ensure the camera is full charged as there will not be an easy way of recharging it without leaving the location.

Further dates will be confirmed if certain shots are not completed.

No comments:

Post a Comment